<?xml version="1.0" encoding="UTF-8"?>
<!--Generated by Site-Server v@build.version@ (http://www.squarespace.com) on Mon, 13 Oct 2025 06:15:44 GMT
--><rss xmlns:content="http://purl.org/rss/1.0/modules/content/" xmlns:wfw="http://wellformedweb.org/CommentAPI/" xmlns:itunes="http://www.itunes.com/dtds/podcast-1.0.dtd" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:media="http://www.rssboard.org/media-rss" version="2.0"><channel><title>NEWS - ALA Planning Partnership</title><link>https://alaplanning.com/news/</link><lastBuildDate>Mon, 28 Jul 2025 06:55:01 +0000</lastBuildDate><language>en-GB</language><generator>Site-Server v@build.version@ (http://www.squarespace.com)</generator><description><![CDATA[]]></description><item><title>Public Consultation for the construction and operation of a 1.9 MW Photovoltaic Park and 2 MWh Energy Storage units in Petrofani Community</title><dc:creator>Evi Argyridou</dc:creator><pubDate>Mon, 28 Jul 2025 06:55:24 +0000</pubDate><link>https://alaplanning.com/news/public-consultation-for-the-construction-and-operation-of-a-19-mw-photovoltaic-park-and-2-mwh-energy-storage-units-in-petrofani-community</link><guid isPermaLink="false">6486d2b3bf60a10890a2b0dc:64935a59c20b206ba87b8dfb:68871e1873e5cb7974f8ec24</guid><description><![CDATA[The Preliminary Environmental Impact Assessment Study prepared for the 
above Project will be available until the 11th of August 2025 in the 
following link:]]></description><content:encoded><![CDATA[<figure class="
              sqs-block-image-figure
              intrinsic
            "
        >
          
        
        

        
          
            
          
            
                
                
                
                
                
                
                
                <img data-stretch="false" data-image="https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/6768ff20-1906-42b4-9b64-025863da9ccf/Photo+sm.jpg" data-image-dimensions="1382x777" data-image-focal-point="0.5,0.5" alt="" data-load="false" elementtiming="system-image-block" src="https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/6768ff20-1906-42b4-9b64-025863da9ccf/Photo+sm.jpg?format=1000w" width="1382" height="777" sizes="(max-width: 640px) 100vw, (max-width: 767px) 100vw, 100vw" onload="this.classList.add(&quot;loaded&quot;)" srcset="https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/6768ff20-1906-42b4-9b64-025863da9ccf/Photo+sm.jpg?format=100w 100w, https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/6768ff20-1906-42b4-9b64-025863da9ccf/Photo+sm.jpg?format=300w 300w, https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/6768ff20-1906-42b4-9b64-025863da9ccf/Photo+sm.jpg?format=500w 500w, https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/6768ff20-1906-42b4-9b64-025863da9ccf/Photo+sm.jpg?format=750w 750w, https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/6768ff20-1906-42b4-9b64-025863da9ccf/Photo+sm.jpg?format=1000w 1000w, https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/6768ff20-1906-42b4-9b64-025863da9ccf/Photo+sm.jpg?format=1500w 1500w, https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/6768ff20-1906-42b4-9b64-025863da9ccf/Photo+sm.jpg?format=2500w 2500w" loading="lazy" decoding="async" data-loader="sqs">

            
          
        
          
        

        
      
        </figure>
      

    
  


  





  <p class="sqsrte-large">The Preliminary Environmental Impact Assessment Study prepared for the above Project will be available until the 11th of August 2025 in the following link:</p><p class="sqsrte-large"><a href="https://alaplanning0.sharepoint.com/:b:/s/AlaplanningLLC/Ec7AwmDYpRNPuHrq3vjByDMBYNjiFm6Uqzz1AOTaiICBEw?e=V4Hanh">250722 PV Parks Petrofani 316&amp;205.pdf</a></p><p class="sqsrte-large">Anyone can submit their comments and opinion(s) regarding the content of the Study or the potential environmental impacts that the Project may have at the following email address: <a href="mailto:info@alaplanning.com">info@alaplanning.com</a>.</p>]]></content:encoded><media:content type="image/jpeg" url="https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/1753685746785-QCCT1DE4BZZG06ZG04PR/Photo+sm.jpg?format=1500w" medium="image" isDefault="true" width="1382" height="777"><media:title type="plain">Public Consultation for the construction and operation of a 1.9 MW Photovoltaic Park and 2 MWh Energy Storage units in Petrofani Community</media:title></media:content></item><item><title>Public Consultation for the construction and operation of a 4,5 MW Photovoltaic Park and 1,5 MWh Energy Storage units in the Community of Pera Oreinis</title><dc:creator>Evi Argyridou</dc:creator><pubDate>Wed, 11 Jun 2025 06:37:00 +0000</pubDate><link>https://alaplanning.com/news/public-consultation-for-the-construction-and-operation-of-a-45-mw-photovoltaic-park-and-15-mwh-energy-storage-units-in-community-of-pera-oreinis</link><guid isPermaLink="false">6486d2b3bf60a10890a2b0dc:64935a59c20b206ba87b8dfb:6849236713741d49c52dacf3</guid><description><![CDATA[The Preliminary Environmental Impact Assessment Study prepared for the 
above Project will be available until the 25th of June 2025 in the 
following link:]]></description><content:encoded><![CDATA[<figure class="
              sqs-block-image-figure
              intrinsic
            "
        >
          
        
        

        
          
            
          
            
                
                
                
                
                
                
                
                <img data-stretch="false" data-image="https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/023dcf74-30dd-4744-9364-c76c6acbf24e/Photo+SM.jpg" data-image-dimensions="998x748" data-image-focal-point="0.5,0.5" alt="" data-load="false" elementtiming="system-image-block" src="https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/023dcf74-30dd-4744-9364-c76c6acbf24e/Photo+SM.jpg?format=1000w" width="998" height="748" sizes="(max-width: 640px) 100vw, (max-width: 767px) 100vw, 100vw" onload="this.classList.add(&quot;loaded&quot;)" srcset="https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/023dcf74-30dd-4744-9364-c76c6acbf24e/Photo+SM.jpg?format=100w 100w, https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/023dcf74-30dd-4744-9364-c76c6acbf24e/Photo+SM.jpg?format=300w 300w, https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/023dcf74-30dd-4744-9364-c76c6acbf24e/Photo+SM.jpg?format=500w 500w, https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/023dcf74-30dd-4744-9364-c76c6acbf24e/Photo+SM.jpg?format=750w 750w, https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/023dcf74-30dd-4744-9364-c76c6acbf24e/Photo+SM.jpg?format=1000w 1000w, https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/023dcf74-30dd-4744-9364-c76c6acbf24e/Photo+SM.jpg?format=1500w 1500w, https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/023dcf74-30dd-4744-9364-c76c6acbf24e/Photo+SM.jpg?format=2500w 2500w" loading="lazy" decoding="async" data-loader="sqs">

            
          
        
          
        

        
      
        </figure>
      

    
  


  





  <p class="sqsrte-large">The Preliminary Environmental Impact Assessment Study prepared for the above Project will be available until the 25th of June 2025 in the following link:</p><p class="sqsrte-large"><a href="https://alaplanning0.sharepoint.com/:b:/s/AlaplanningLLC/EYfH6rY_qkRLlTHWetPN34oB8F6a0QrOCuRQGyINXDIn_A?e=dNgMNK">241002 PV Park Pera.pdf</a></p><p class="sqsrte-large">Anyone can submit their comments and opinion(s) regarding the content of the Study or the potential environmental impacts that the Project may have at the following email address: <a href="mailto:info@alaplanning.com">info@alaplanning.com</a>.</p>]]></content:encoded><media:content type="image/jpeg" url="https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/1749623975577-34FHN0EP722NWTRQK9HP/Photo+SM.jpg?format=1500w" medium="image" isDefault="true" width="998" height="748"><media:title type="plain">Public Consultation for the construction and operation of a 4,5 MW Photovoltaic Park and 1,5 MWh Energy Storage units in the Community of Pera Oreinis</media:title></media:content></item><item><title>Public Presentation for the construction and operation of the mixed development Wolga, in Pyrgos, Limassol</title><dc:creator>Evi Argyridou</dc:creator><pubDate>Wed, 02 Apr 2025 12:05:00 +0000</pubDate><link>https://alaplanning.com/news/public-presentation-for-the-construction-and-operation-of-the-mixed-development-wolga-in-pyrgos-limassol</link><guid isPermaLink="false">6486d2b3bf60a10890a2b0dc:64935a59c20b206ba87b8dfb:67ed275245321e15179e85d6</guid><description><![CDATA[We invite you to the Public Presentation for the construction and operation 
of the mixed development Wolga, in Pyrgos, Limassol, which will take place 
on Tuesday, April 8, 2025, at 18:00 at the Limassol Municipal Cultural 
Centre Panos Solomonidis, at 8 Panou Solomonidis Street, 3032 Limassol 
(formerly Androutsou).]]></description><content:encoded><![CDATA[<figure class="
              sqs-block-image-figure
              intrinsic
            "
        >
          
        
        

        
          
            
          
            
                
                
                
                
                
                
                
                <img data-stretch="false" data-image="https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/75a47e2b-6027-4231-acaf-ba4a10237865/tennis+club+3d.jpg" data-image-dimensions="1239x696" data-image-focal-point="0.5,0.5" alt="" data-load="false" elementtiming="system-image-block" src="https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/75a47e2b-6027-4231-acaf-ba4a10237865/tennis+club+3d.jpg?format=1000w" width="1239" height="696" sizes="(max-width: 640px) 100vw, (max-width: 767px) 100vw, 100vw" onload="this.classList.add(&quot;loaded&quot;)" srcset="https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/75a47e2b-6027-4231-acaf-ba4a10237865/tennis+club+3d.jpg?format=100w 100w, https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/75a47e2b-6027-4231-acaf-ba4a10237865/tennis+club+3d.jpg?format=300w 300w, https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/75a47e2b-6027-4231-acaf-ba4a10237865/tennis+club+3d.jpg?format=500w 500w, https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/75a47e2b-6027-4231-acaf-ba4a10237865/tennis+club+3d.jpg?format=750w 750w, https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/75a47e2b-6027-4231-acaf-ba4a10237865/tennis+club+3d.jpg?format=1000w 1000w, https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/75a47e2b-6027-4231-acaf-ba4a10237865/tennis+club+3d.jpg?format=1500w 1500w, https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/75a47e2b-6027-4231-acaf-ba4a10237865/tennis+club+3d.jpg?format=2500w 2500w" loading="lazy" decoding="async" data-loader="sqs">

            
          
        
          
        

        
      
        </figure>
      

    
  


  





  <p class="sqsrte-large">We invite you to the Public Presentation for the construction and operation of the mixed development <em>Wolga</em>, in Pyrgos, Limassol, which will take place on Tuesday, April 8, 2025, at 18:00 at the Limassol Municipal Cultural Centre Panos Solomonidis, at 8 Panou Solomonidis Street, 3032 Limassol (formerly Androutsou).</p><p class="sqsrte-large">The Preliminary Environmental Impact Assessment Study prepared for the above Project will be available in the following link until Wednesday 09, 2025:</p><p class="sqsrte-large"><a href="https://alaplanning0.sharepoint.com/:b:/s/AlaplanningLLC/EamqYqZfOy9Kg_8s__iBsn0BrTmjn4KdxT80VX8v8GbSnQ?e=MsLl80">250402 Preliminary MEEP Wolga, Pyrgos Lem.pdf</a></p><p class="sqsrte-large">Anyone can submit their comments and opinion(s) regarding the content of the Study or the potential environmental impacts that the Project may have at the following email address: <a href="mailto:info@alaplanning.com">info@alaplanning.com</a>.</p>]]></content:encoded><media:content type="image/jpeg" url="https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/1743595626960-2QXLA4X2YW63TTFDIRZB/tennis+club+3d.jpg?format=1500w" medium="image" isDefault="true" width="1239" height="696"><media:title type="plain">Public Presentation for the construction and operation of the mixed development Wolga, in Pyrgos, Limassol</media:title></media:content></item><item><title>Public Consultation for the construction and operation of a 2,03 MW Photovoltaic Park and 2,382 kWh Energy Storage units in Aradippou Municipality</title><dc:creator>Evi Argyridou</dc:creator><pubDate>Mon, 18 Nov 2024 10:14:14 +0000</pubDate><link>https://alaplanning.com/news/public-consultation-for-the-construction-and-operation-of-a-2382-kwh-mw-photovoltaic-park-in-aradippou-municipality</link><guid isPermaLink="false">6486d2b3bf60a10890a2b0dc:64935a59c20b206ba87b8dfb:673b12fa2d3f1a750665864b</guid><description><![CDATA[The Preliminary Environmental Impact Assessment Study prepared for the 
above Project will be available until the 2nd of December 2024 in the 
following link:]]></description><content:encoded><![CDATA[<figure class="
              sqs-block-image-figure
              intrinsic
            "
        >
          
        
        

        
          
            
          
            
                
                
                
                
                
                
                
                <img data-stretch="false" data-image="https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/f24fa22d-c6ba-462f-8df8-988689c8a5b2/PV+Park.jpg" data-image-dimensions="1229x818" data-image-focal-point="0.5,0.5" alt="" data-load="false" elementtiming="system-image-block" src="https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/f24fa22d-c6ba-462f-8df8-988689c8a5b2/PV+Park.jpg?format=1000w" width="1229" height="818" sizes="(max-width: 640px) 100vw, (max-width: 767px) 100vw, 100vw" onload="this.classList.add(&quot;loaded&quot;)" srcset="https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/f24fa22d-c6ba-462f-8df8-988689c8a5b2/PV+Park.jpg?format=100w 100w, https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/f24fa22d-c6ba-462f-8df8-988689c8a5b2/PV+Park.jpg?format=300w 300w, https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/f24fa22d-c6ba-462f-8df8-988689c8a5b2/PV+Park.jpg?format=500w 500w, https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/f24fa22d-c6ba-462f-8df8-988689c8a5b2/PV+Park.jpg?format=750w 750w, https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/f24fa22d-c6ba-462f-8df8-988689c8a5b2/PV+Park.jpg?format=1000w 1000w, https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/f24fa22d-c6ba-462f-8df8-988689c8a5b2/PV+Park.jpg?format=1500w 1500w, https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/f24fa22d-c6ba-462f-8df8-988689c8a5b2/PV+Park.jpg?format=2500w 2500w" loading="lazy" decoding="async" data-loader="sqs">

            
          
        
          
        

        
      
        </figure>
      

    
  


  





  <p class="sqsrte-large">The Preliminary Environmental Impact Assessment Study prepared for the above Project will be available until the 2nd of December 2024 in the following link:</p><p class="sqsrte-large"><a href="https://alaplanning0.sharepoint.com/:f:/s/AlaplanningLLC/ErP1S0wP65JOu3CdfhWVNmMBH48iaiT8K535YzX-5yYCOg?e=Z5XbQ3">MEEP PV Park Aradippou DF</a></p><p class="sqsrte-large">Anyone can submit their comments and opinion(s) regarding the content of the Study or the potential environmental impacts that the Project may have at the following email address: <a href="mailto:info@alaplanning.com">info@alaplanning.com</a>.</p>]]></content:encoded><media:content type="image/jpeg" url="https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/1731925047774-8CUSI2RMDHWNV0SHJX7Z/PV+Park.jpg?format=1500w" medium="image" isDefault="true" width="1229" height="818"><media:title type="plain">Public Consultation for the construction and operation of a 2,03 MW Photovoltaic Park and 2,382 kWh Energy Storage units in Aradippou Municipality</media:title></media:content></item><item><title>Public Presentation for the Land Division and Masterplan for a mixed office and residential development at the old KEAN Factory, in Agios Athanasios, in Amathounta Municipality&nbsp;</title><dc:creator>Evi Argyridou</dc:creator><pubDate>Thu, 14 Nov 2024 09:16:50 +0000</pubDate><link>https://alaplanning.com/news/public-presentation-for-the-land-division-and-masterplan-for-a-mixed-office-and-residential-development-at-the-old-kean-factory-in-agios-athanasios-in-amathounta-municipalitynbsp</link><guid isPermaLink="false">6486d2b3bf60a10890a2b0dc:64935a59c20b206ba87b8dfb:6735bf88a520f5538d99074c</guid><description><![CDATA[We invite you to the Public Presentation for the Land Division and 
Masterplan for a mixed office and residential development at the old KEAN 
Factory, in Agios Athanasios, in Amathounta Municipality, which will take 
place on Thursday, November 21, 2024, at 18:00 at Limassol Municipal 
Cultural Centre Panos Solomonidis, at 8 Panou Solomonidis Street, 3032 
Limassol (formerly Androutsou).]]></description><content:encoded><![CDATA[<figure class="
              sqs-block-image-figure
              intrinsic
            "
        >
          
        
        

        
          
            
          
            
                
                
                
                
                
                
                
                <img data-stretch="false" data-image="https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/e31634c3-f346-40d9-83c1-28a9c53c0def/Photo+small.jpg" data-image-dimensions="1470x825" data-image-focal-point="0.5,0.5" alt="" data-load="false" elementtiming="system-image-block" src="https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/e31634c3-f346-40d9-83c1-28a9c53c0def/Photo+small.jpg?format=1000w" width="1470" height="825" sizes="(max-width: 640px) 100vw, (max-width: 767px) 100vw, 100vw" onload="this.classList.add(&quot;loaded&quot;)" srcset="https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/e31634c3-f346-40d9-83c1-28a9c53c0def/Photo+small.jpg?format=100w 100w, https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/e31634c3-f346-40d9-83c1-28a9c53c0def/Photo+small.jpg?format=300w 300w, https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/e31634c3-f346-40d9-83c1-28a9c53c0def/Photo+small.jpg?format=500w 500w, https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/e31634c3-f346-40d9-83c1-28a9c53c0def/Photo+small.jpg?format=750w 750w, https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/e31634c3-f346-40d9-83c1-28a9c53c0def/Photo+small.jpg?format=1000w 1000w, https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/e31634c3-f346-40d9-83c1-28a9c53c0def/Photo+small.jpg?format=1500w 1500w, https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/e31634c3-f346-40d9-83c1-28a9c53c0def/Photo+small.jpg?format=2500w 2500w" loading="lazy" decoding="async" data-loader="sqs">

            
          
        
          
        

        
      
        </figure>
      

    
  


  





  <p class="sqsrte-large">We invite you to the Public Presentation for the Land Division and Masterplan for a mixed office and residential development at the old KEAN Factory, in Agios Athanasios, in Amathounta Municipality, which will take place on Thursday, November 21, 2024, at 18:00 at Limassol Municipal Cultural Centre Panos Solomonidis, at 8 Panou Solomonidis Street, 3032 Limassol (formerly Androutsou).</p><p class="sqsrte-large">The Environmental Impact Assessment Study prepared for the above Project will be available in the following link until November 22, 2024:</p><p class="sqsrte-large"><a href="https://alaplanning0.sharepoint.com/:b:/s/AlaplanningLLC/EVLD7OHUOmtIj_4TTyjkkf8BMwc5TFUtV3M7OS1sVlQFHA?e=K7YW9F">241114 Preliminary MEEP KEAN Mixed Use Lim.pdf</a></p><p class="sqsrte-large">Anyone can submit their comments and opinion(s) regarding the content of the Study or the potential environmental impacts that the Project may have at the following email address: <a href="mailto:info@alaplanning.com">info@alaplanning.com</a>.</p>]]></content:encoded><media:content type="image/jpeg" url="https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/1731576311132-S5CL0OF3CZB8QIT0M62B/Photo+small.jpg?format=1500w" medium="image" isDefault="true" width="1470" height="825"><media:title type="plain">Public Presentation for the Land Division and Masterplan for a mixed office and residential development at the old KEAN Factory, in Agios Athanasios, in Amathounta Municipality&nbsp;</media:title></media:content></item><item><title>Public Presentation for the construction and operation of an integrated Development of Large and Complex Uses in Agios Athanasios, in Amathounta Municipality</title><dc:creator>Evi Argyridou</dc:creator><pubDate>Tue, 29 Oct 2024 08:01:15 +0000</pubDate><link>https://alaplanning.com/news/public-presentation-for-the-construction-and-operation-of-an-integrated-development-of-large-and-complex-uses-in-agios-athanasios-in-amathounta-municipality</link><guid isPermaLink="false">6486d2b3bf60a10890a2b0dc:64935a59c20b206ba87b8dfb:672095d73bd85a6f75fbecd8</guid><description><![CDATA[We invite you to the Public Presentation for the construction and operation 
of an Integrated Development of Large and Complex Uses, in Agios 
Athanasios, in Amathounta Municipality, which will take place on Tuesday, 
November 05, 2024, at 18:00 at the Event Hall of the Holy Metropolis of 
Limassol, at Hellas and Enoseos corner (Precinct of the Metropolitan Church 
of Panagia Pantanassis – Katholikis).]]></description><content:encoded><![CDATA[<figure class="
              sqs-block-image-figure
              intrinsic
            "
        >
          
        
        

        
          
            
          
            
                
                
                
                
                
                
                
                <img data-stretch="false" data-image="https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/b2514ca9-4b0f-421b-9dfc-d1685f78d11e/05+small.jpg" data-image-dimensions="2339x1653" data-image-focal-point="0.5,0.5" alt="" data-load="false" elementtiming="system-image-block" src="https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/b2514ca9-4b0f-421b-9dfc-d1685f78d11e/05+small.jpg?format=1000w" width="2339" height="1653" sizes="(max-width: 640px) 100vw, (max-width: 767px) 100vw, 100vw" onload="this.classList.add(&quot;loaded&quot;)" srcset="https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/b2514ca9-4b0f-421b-9dfc-d1685f78d11e/05+small.jpg?format=100w 100w, https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/b2514ca9-4b0f-421b-9dfc-d1685f78d11e/05+small.jpg?format=300w 300w, https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/b2514ca9-4b0f-421b-9dfc-d1685f78d11e/05+small.jpg?format=500w 500w, https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/b2514ca9-4b0f-421b-9dfc-d1685f78d11e/05+small.jpg?format=750w 750w, https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/b2514ca9-4b0f-421b-9dfc-d1685f78d11e/05+small.jpg?format=1000w 1000w, https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/b2514ca9-4b0f-421b-9dfc-d1685f78d11e/05+small.jpg?format=1500w 1500w, https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/b2514ca9-4b0f-421b-9dfc-d1685f78d11e/05+small.jpg?format=2500w 2500w" loading="lazy" decoding="async" data-loader="sqs">

            
          
        
          
        

        
      
        </figure>
      

    
  


  





  <p class="sqsrte-large">We invite you to the Public Presentation for the construction and operation of an Integrated Development of Large and Complex Uses, in Agios Athanasios, in Amathounta Municipality, which will take place on Tuesday, November 05, 2024, at 18:00 at the Event Hall of the Holy Metropolis of Limassol, at Hellas and Enoseos corner (Precinct of the Metropolitan Church of Panagia Pantanassis – Katholikis).</p><p class="sqsrte-large">The Environmental Impact Assessment Study prepared for the above Project will be available in the following link until November 8, 2024:</p><p class="sqsrte-large"><a href="https://alaplanning0.sharepoint.com/:b:/s/AlaplanningLLC/EVY3i43uf7lFuXK9B_nrZYEB0Qi7EaFZxqNPXzGo7ugPUw?e=8JtX86">231219 MEEP Sfalaggiotissa.pdf</a></p><p class="sqsrte-large">Anyone can submit their comments and opinion(s) regarding the content of the Study or the potential environmental impacts that the Project may have at the following email address: <a href="mailto:info@alaplanning.com">info@alaplanning.com</a>.</p>]]></content:encoded><media:content type="image/jpeg" url="https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/1730189112803-T6U6UCH58OJHL9RVP3GH/05+small.jpg?format=1500w" medium="image" isDefault="true" width="1500" height="1060"><media:title type="plain">Public Presentation for the construction and operation of an integrated Development of Large and Complex Uses in Agios Athanasios, in Amathounta Municipality</media:title></media:content></item><item><title>Public Presentation for the construction and operation of the integrated Development of Large and Complex Uses in the Mathikoloni and Fasoula community, in Limassol</title><dc:creator>Evi Argyridou</dc:creator><pubDate>Mon, 07 Oct 2024 07:15:00 +0000</pubDate><link>https://alaplanning.com/news/public-presentation-for-the-construction-and-operation-of-the-integrated-development-of-large-and-complex-uses-in-the-mathikoloni-and-fasoula-community-in-limassol</link><guid isPermaLink="false">6486d2b3bf60a10890a2b0dc:64935a59c20b206ba87b8dfb:67038a3237a5ce068947337c</guid><description><![CDATA[We invite you to the Public Presentation for the construction and operation 
of the Integrated Development of Large and Complex Uses, in the Community 
of Mathikoloni and Fasoula, which will take place on Friday, October 11, 
2024, at 17:00 at the Municipal Cultural Centre Panos Solomonidis (8 Panou 
Solomonidi 3032 Limassol).]]></description><content:encoded><![CDATA[<figure class="
              sqs-block-image-figure
              intrinsic
            "
        >
          
        
        

        
          
            
          
            
                
                
                
                
                
                
                
                <img data-stretch="false" data-image="https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/9a7e6625-d0bb-49fa-998c-66ca302f50b4/Picture+sm.jpg" data-image-dimensions="1312x1043" data-image-focal-point="0.5,0.5" alt="" data-load="false" elementtiming="system-image-block" src="https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/9a7e6625-d0bb-49fa-998c-66ca302f50b4/Picture+sm.jpg?format=1000w" width="1312" height="1043" sizes="(max-width: 640px) 100vw, (max-width: 767px) 100vw, 100vw" onload="this.classList.add(&quot;loaded&quot;)" srcset="https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/9a7e6625-d0bb-49fa-998c-66ca302f50b4/Picture+sm.jpg?format=100w 100w, https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/9a7e6625-d0bb-49fa-998c-66ca302f50b4/Picture+sm.jpg?format=300w 300w, https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/9a7e6625-d0bb-49fa-998c-66ca302f50b4/Picture+sm.jpg?format=500w 500w, https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/9a7e6625-d0bb-49fa-998c-66ca302f50b4/Picture+sm.jpg?format=750w 750w, https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/9a7e6625-d0bb-49fa-998c-66ca302f50b4/Picture+sm.jpg?format=1000w 1000w, https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/9a7e6625-d0bb-49fa-998c-66ca302f50b4/Picture+sm.jpg?format=1500w 1500w, https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/9a7e6625-d0bb-49fa-998c-66ca302f50b4/Picture+sm.jpg?format=2500w 2500w" loading="lazy" decoding="async" data-loader="sqs">

            
          
        
          
        

        
      
        </figure>
      

    
  


  





  <p class="sqsrte-large">We invite you to the Public Presentation for the construction and operation of the Integrated Development of Large and Complex Uses, in the Community of Mathikoloni and Fasoula, which will take place on Friday, October 11, 2024, at 17:00 at the Municipal Cultural Centre Panos Solomonidis (8 Panou Solomonidi 3032 Limassol).</p><p class="sqsrte-large">The Preliminary Environmental Impact Assessment Study prepared for the above Project can be found in the following link:</p><p class="sqsrte-large"><a href="https://alaplanning0.sharepoint.com/:b:/s/AlaplanningLLC/EQ8KNVNwKAJEgAmBKJv0sRcBAGyZNX7s3DG6JnXX63iN0A?e=hacxeO">240327 EIA MED Project Lim.pdf</a></p><p class="sqsrte-large">Anyone can submit their comments and opinion(s) regarding the content of the Study or the potential environmental impacts that the Project may have at the following email address: <a href="mailto:info@alaplanning.com">info@alaplanning.com</a>.</p>]]></content:encoded><media:content type="image/jpeg" url="https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/1728285578735-YTC3KKZWERWXOK7FLGCU/Picture+sm.jpg?format=1500w" medium="image" isDefault="true" width="1312" height="1043"><media:title type="plain">Public Presentation for the construction and operation of the integrated Development of Large and Complex Uses in the Mathikoloni and Fasoula community, in Limassol</media:title></media:content></item><item><title>Public Presentation for the construction and operation of the integrated Development of Large and Complex Uses “The Island” in Palodia Community</title><dc:creator>Evi Argyridou</dc:creator><pubDate>Thu, 19 Sep 2024 08:21:54 +0000</pubDate><link>https://alaplanning.com/news/public-presentation-for-the-construction-and-operation-of-the-integrated-development-of-large-and-complex-uses-the-island-in-palodia-community</link><guid isPermaLink="false">6486d2b3bf60a10890a2b0dc:64935a59c20b206ba87b8dfb:66ebdeb949b88f03648223a4</guid><description><![CDATA[We invite you to the Public Presentation for the construction and operation 
of the Integrated Development of Large and Complex Uses The Island, in the 
Community of Palodia, which will take place on Wednesday, September 25, 
2024, at 18:00 at the Water Museum (66, Franklin Roosevelt Avenue, 3012 
Limassol).]]></description><content:encoded><![CDATA[<figure class="
              sqs-block-image-figure
              intrinsic
            "
        >
          
        
        

        
          
            
          
            
                
                
                
                
                
                
                
                <img data-stretch="false" data-image="https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/489cb692-b46e-4dd5-b76b-1ab155ee4ebc/240918+The+Island+-+Masterplan+Sketch+for+Publish+sm.jpg" data-image-dimensions="1536x1536" data-image-focal-point="0.5,0.5" alt="" data-load="false" elementtiming="system-image-block" src="https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/489cb692-b46e-4dd5-b76b-1ab155ee4ebc/240918+The+Island+-+Masterplan+Sketch+for+Publish+sm.jpg?format=1000w" width="1536" height="1536" sizes="(max-width: 640px) 100vw, (max-width: 767px) 100vw, 100vw" onload="this.classList.add(&quot;loaded&quot;)" srcset="https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/489cb692-b46e-4dd5-b76b-1ab155ee4ebc/240918+The+Island+-+Masterplan+Sketch+for+Publish+sm.jpg?format=100w 100w, https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/489cb692-b46e-4dd5-b76b-1ab155ee4ebc/240918+The+Island+-+Masterplan+Sketch+for+Publish+sm.jpg?format=300w 300w, https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/489cb692-b46e-4dd5-b76b-1ab155ee4ebc/240918+The+Island+-+Masterplan+Sketch+for+Publish+sm.jpg?format=500w 500w, https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/489cb692-b46e-4dd5-b76b-1ab155ee4ebc/240918+The+Island+-+Masterplan+Sketch+for+Publish+sm.jpg?format=750w 750w, https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/489cb692-b46e-4dd5-b76b-1ab155ee4ebc/240918+The+Island+-+Masterplan+Sketch+for+Publish+sm.jpg?format=1000w 1000w, https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/489cb692-b46e-4dd5-b76b-1ab155ee4ebc/240918+The+Island+-+Masterplan+Sketch+for+Publish+sm.jpg?format=1500w 1500w, https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/489cb692-b46e-4dd5-b76b-1ab155ee4ebc/240918+The+Island+-+Masterplan+Sketch+for+Publish+sm.jpg?format=2500w 2500w" loading="lazy" decoding="async" data-loader="sqs">

            
          
        
          
        

        
      
        </figure>
      

    
  


  





  <p class="sqsrte-large">We invite you to the Public Presentation for the construction and operation of the Integrated Development of Large and Complex Uses <em>The Island</em>, in the Community of Palodia, which will take place on Wednesday, September 25, 2024, at 18:00 at the Water Museum (66, Franklin Roosevelt Avenue, 3012 Limassol).</p><p class="sqsrte-large">The Preliminary Environmental Impact Assessment Study prepared for the above Project can be found in the following link:</p><p class="sqsrte-large"><a href="https://alaplanning0.sharepoint.com/:b:/s/AlaplanningLLC/EZeAaVWe6n9HoTwMqV1swBcBlkNpiEHoV8NMtdqUkFy0Jg?e=2keYva">240613 MEEP The Island Masteplan Palodeia.pdf</a></p><p class="sqsrte-large">Anyone can submit their comments and opinion(s) regarding the content of the Study or the potential environmental impacts that the Project may have at the following email address: <a href="mailto:info@alaplanning.com">info@alaplanning.com</a>.</p>]]></content:encoded><media:content type="image/jpeg" url="https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/1726734932825-NCMCEHZRA6M5DBMFJVAZ/240918+The+Island+-+Masterplan+Sketch+for+Publish+sm.jpg?format=1500w" medium="image" isDefault="true" width="1500" height="1500"><media:title type="plain">Public Presentation for the construction and operation of the integrated Development of Large and Complex Uses “The Island” in Palodia Community</media:title></media:content></item><item><title>Public Presentation for the construction and operation of the residential development «AQUA Residences» and the beach enrichment, in Larnaca Municipality</title><dc:creator>Evi Argyridou</dc:creator><pubDate>Wed, 24 Jul 2024 06:45:00 +0000</pubDate><link>https://alaplanning.com/news/public-presentation-for-the-construction-and-operation-of-the-residential-development-aqua-residences-and-the-beach-enrichment-in-larnaca-municipality</link><guid isPermaLink="false">6486d2b3bf60a10890a2b0dc:64935a59c20b206ba87b8dfb:66a0a2b501e0ae5beee2f3c9</guid><description><![CDATA[We invite you to the Public Presentation for the construction and operation 
of the residential development «AQUA Residences», and the beach enrichment, 
in Larnaca Municipality, which will take place on Wednesday, July 31, 2024, 
at 18:30 at the Multipurpose Centre of Social Welfare and Employment, (62 
Faneromenis Avenue, 6025 Larnaca).]]></description><content:encoded><![CDATA[<figure class="
              sqs-block-image-figure
              intrinsic
            "
        >
          
        
        

        
          
            
          
            
                
                
                
                
                
                
                
                <img data-stretch="false" data-image="https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/e8569c18-8aed-4664-9e6c-bdf6be69bcaf/AQUA+sm+2.jpg" data-image-dimensions="1517x861" data-image-focal-point="0.5,0.5" alt="" data-load="false" elementtiming="system-image-block" src="https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/e8569c18-8aed-4664-9e6c-bdf6be69bcaf/AQUA+sm+2.jpg?format=1000w" width="1517" height="861" sizes="(max-width: 640px) 100vw, (max-width: 767px) 100vw, 100vw" onload="this.classList.add(&quot;loaded&quot;)" srcset="https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/e8569c18-8aed-4664-9e6c-bdf6be69bcaf/AQUA+sm+2.jpg?format=100w 100w, https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/e8569c18-8aed-4664-9e6c-bdf6be69bcaf/AQUA+sm+2.jpg?format=300w 300w, https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/e8569c18-8aed-4664-9e6c-bdf6be69bcaf/AQUA+sm+2.jpg?format=500w 500w, https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/e8569c18-8aed-4664-9e6c-bdf6be69bcaf/AQUA+sm+2.jpg?format=750w 750w, https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/e8569c18-8aed-4664-9e6c-bdf6be69bcaf/AQUA+sm+2.jpg?format=1000w 1000w, https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/e8569c18-8aed-4664-9e6c-bdf6be69bcaf/AQUA+sm+2.jpg?format=1500w 1500w, https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/e8569c18-8aed-4664-9e6c-bdf6be69bcaf/AQUA+sm+2.jpg?format=2500w 2500w" loading="lazy" decoding="async" data-loader="sqs">

            
          
        
          
        

        
      
        </figure>
      

    
  


  





  <p class="sqsrte-large">We invite you to the Public Presentation for the construction and operation of the residential development «AQUA Residences», and the beach enrichment, in Larnaca Municipality, which will take place on Wednesday, July 31, 2024, at 18:30 at the Multipurpose Centre of Social Welfare and Employment, (62 Faneromenis Avenue, 6025 Larnaca).</p><p class="sqsrte-large">The Environmental Impact Assessment Studies prepared for the above Project will be available until the 7th of August 2024 in the following link:</p><p class="sqsrte-large"><a href="https://alaplanning0.sharepoint.com/:f:/s/AlaplanningLLC/Ep9tfV0en4RLtw30CNC53kkBIhmdv09vRtYcV79x89pCBw?e=2bYv6p">EIA AQUA</a></p><p class="sqsrte-large">Anyone can submit their comments and opinion(s) regarding the content of the Study or the potential environmental impacts that the Project may have at the following email address: <a href="mailto:info@alaplanning.com">info@alaplanning.com</a>.</p>]]></content:encoded><media:content type="image/jpeg" url="https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/1721804007670-MS4DQ53833MVOP4SID1D/AQUA+sm+2.jpg?format=1500w" medium="image" isDefault="true" width="1500" height="851"><media:title type="plain">Public Presentation for the construction and operation of the residential development «AQUA Residences» and the beach enrichment, in Larnaca Municipality</media:title></media:content></item><item><title>Public Presentation for the construction and operation of a Fuel Station in Kokkines Quarter, Larnaca</title><dc:creator>Evi Argyridou</dc:creator><pubDate>Mon, 22 Jul 2024 05:01:00 +0000</pubDate><link>https://alaplanning.com/news/public-presentation-for-the-construction-and-operation-of-a-fuel-station-in-kokkines-quarter-larnaca</link><guid isPermaLink="false">6486d2b3bf60a10890a2b0dc:64935a59c20b206ba87b8dfb:669e14c8fee941277c4148a4</guid><description><![CDATA[We would like to invite you to the Public Presentation for the construction 
and operation of a fuel station of "EKO Cyprus Ltd" in plot 151 (Sh/Pl 
40/48W2, Section: 01) within the administrative boundaries of Kokkines 
Quarter, Larnaca.]]></description><content:encoded><![CDATA[<figure class="
              sqs-block-image-figure
              intrinsic
            "
        >
          
        
        

        
          
            
          
            
                
                
                
                
                
                
                
                <img data-stretch="false" data-image="https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/83cadee0-9df5-4aa8-9bdb-aa275e054972/%CE%95%CE%B9%CE%BA%CF%8C%CE%BD%CE%B1+%CE%B3%CE%B9%CE%B1+%CE%AC%CF%81%CE%B8%CF%81%CE%BF.png" data-image-dimensions="1157x672" data-image-focal-point="0.5,0.5" alt="" data-load="false" elementtiming="system-image-block" src="https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/83cadee0-9df5-4aa8-9bdb-aa275e054972/%CE%95%CE%B9%CE%BA%CF%8C%CE%BD%CE%B1+%CE%B3%CE%B9%CE%B1+%CE%AC%CF%81%CE%B8%CF%81%CE%BF.png?format=1000w" width="1157" height="672" sizes="(max-width: 640px) 100vw, (max-width: 767px) 100vw, 100vw" onload="this.classList.add(&quot;loaded&quot;)" srcset="https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/83cadee0-9df5-4aa8-9bdb-aa275e054972/%CE%95%CE%B9%CE%BA%CF%8C%CE%BD%CE%B1+%CE%B3%CE%B9%CE%B1+%CE%AC%CF%81%CE%B8%CF%81%CE%BF.png?format=100w 100w, https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/83cadee0-9df5-4aa8-9bdb-aa275e054972/%CE%95%CE%B9%CE%BA%CF%8C%CE%BD%CE%B1+%CE%B3%CE%B9%CE%B1+%CE%AC%CF%81%CE%B8%CF%81%CE%BF.png?format=300w 300w, https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/83cadee0-9df5-4aa8-9bdb-aa275e054972/%CE%95%CE%B9%CE%BA%CF%8C%CE%BD%CE%B1+%CE%B3%CE%B9%CE%B1+%CE%AC%CF%81%CE%B8%CF%81%CE%BF.png?format=500w 500w, https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/83cadee0-9df5-4aa8-9bdb-aa275e054972/%CE%95%CE%B9%CE%BA%CF%8C%CE%BD%CE%B1+%CE%B3%CE%B9%CE%B1+%CE%AC%CF%81%CE%B8%CF%81%CE%BF.png?format=750w 750w, https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/83cadee0-9df5-4aa8-9bdb-aa275e054972/%CE%95%CE%B9%CE%BA%CF%8C%CE%BD%CE%B1+%CE%B3%CE%B9%CE%B1+%CE%AC%CF%81%CE%B8%CF%81%CE%BF.png?format=1000w 1000w, https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/83cadee0-9df5-4aa8-9bdb-aa275e054972/%CE%95%CE%B9%CE%BA%CF%8C%CE%BD%CE%B1+%CE%B3%CE%B9%CE%B1+%CE%AC%CF%81%CE%B8%CF%81%CE%BF.png?format=1500w 1500w, https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/83cadee0-9df5-4aa8-9bdb-aa275e054972/%CE%95%CE%B9%CE%BA%CF%8C%CE%BD%CE%B1+%CE%B3%CE%B9%CE%B1+%CE%AC%CF%81%CE%B8%CF%81%CE%BF.png?format=2500w 2500w" loading="lazy" decoding="async" data-loader="sqs">

            
          
        
          
        

        
      
        </figure>
      

    
  


  





  <p class="sqsrte-large">We would like to invite you to the Public Presentation for the construction and operation of a fuel station of "EKO Cyprus Ltd" in plot 151 (Sh/Pl 40/48W2, Section: 01) within the administrative boundaries of Kokkines Quarter, Larnaca.</p><p class="sqsrte-large">The Public Presentation will take place on Friday, July 26, 2024, at 17:00 at the Antonis Papadopoulos Stadium (Kyriakos Theocharous Hall).</p><p class="sqsrte-large">The presentation will refer to the proposed Project and the Environmental Impact Assessment Study, that has been prepared by the Project’s Environmental Consultants (ALA Planning Partnership Consultancy L.L.C.) and its purpose is to provide general information about the Project, to state the main environmental issues arising therefrom and to give the public an opportunity to submit their comments and views.</p><p class="sqsrte-large">The Preliminary Environmental Impact Assessment Study prepared for the above Project will be available until the 2nd of August 2024 in the following link:</p><p class="sqsrte-large"><a href="https://alaplanning0.sharepoint.com/:b:/s/AlaplanningLLC/EX0UdnGcYGBJtKWYpmUi-dUByD2GNKCHmETSf38WbajkQg?e=YEmcgx">240722 Prokatarktiki MEEP Prat. Kausimwn EKO, Larnaca.pdf</a> </p><p class="sqsrte-large">Anyone can submit their comments and opinion(s) regarding the content of the Study or the potential environmental impacts that the Project may have at the following email address: <a href="mailto:info@alaplanning.com">info@alaplanning.com</a>.</p>]]></content:encoded><media:content type="image/png" url="https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/1721636352043-6HW762O3VK7J066YCLAJ/%CE%95%CE%B9%CE%BA%CF%8C%CE%BD%CE%B1+%CE%B3%CE%B9%CE%B1+%CE%AC%CF%81%CE%B8%CF%81%CE%BF.png?format=1500w" medium="image" isDefault="true" width="1157" height="672"><media:title type="plain">Public Presentation for the construction and operation of a Fuel Station in Kokkines Quarter, Larnaca</media:title></media:content></item><item><title>Public Consultation for the construction and operation of a 2,5 MW Photovoltaic Park in the Community of Asgata, Limassol District</title><dc:creator>Evi Argyridou</dc:creator><pubDate>Fri, 21 Jun 2024 01:11:00 +0000</pubDate><link>https://alaplanning.com/news/public-consultation-for-the-construction-and-operation-of-a-25-mw-photovoltaic-park-in-the-community-of-asgata-limassol-district</link><guid isPermaLink="false">6486d2b3bf60a10890a2b0dc:64935a59c20b206ba87b8dfb:667533ed94c7096f19a36a45</guid><description><![CDATA[The Preliminary Environmental Impact Assessment Study prepared for the 
above Project will be available until the 5th of July 2024 in the following 
link:]]></description><content:encoded><![CDATA[<figure class="
              sqs-block-image-figure
              intrinsic
            "
        >
          
        
        

        
          
            
          
            
                
                
                
                
                
                
                
                <img data-stretch="false" data-image="https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/73f39f84-915f-491d-9f24-82e4af008326/photo+sm.jpg" data-image-dimensions="1536x1022" data-image-focal-point="0.5,0.5" alt="" data-load="false" elementtiming="system-image-block" src="https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/73f39f84-915f-491d-9f24-82e4af008326/photo+sm.jpg?format=1000w" width="1536" height="1022" sizes="(max-width: 640px) 100vw, (max-width: 767px) 100vw, 100vw" onload="this.classList.add(&quot;loaded&quot;)" srcset="https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/73f39f84-915f-491d-9f24-82e4af008326/photo+sm.jpg?format=100w 100w, https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/73f39f84-915f-491d-9f24-82e4af008326/photo+sm.jpg?format=300w 300w, https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/73f39f84-915f-491d-9f24-82e4af008326/photo+sm.jpg?format=500w 500w, https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/73f39f84-915f-491d-9f24-82e4af008326/photo+sm.jpg?format=750w 750w, https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/73f39f84-915f-491d-9f24-82e4af008326/photo+sm.jpg?format=1000w 1000w, https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/73f39f84-915f-491d-9f24-82e4af008326/photo+sm.jpg?format=1500w 1500w, https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/73f39f84-915f-491d-9f24-82e4af008326/photo+sm.jpg?format=2500w 2500w" loading="lazy" decoding="async" data-loader="sqs">

            
          
        
          
        

        
      
        </figure>
      

    
  


  





  <p class="sqsrte-large">The Preliminary Environmental Impact Assessment Study prepared for the above Project will be available until the 5th of July 2024 in the following link:</p><p class="sqsrte-large"><a href="https://alaplanning0.sharepoint.com/:b:/s/AlaplanningLLC/EZHHfk8rb8BNtfXGQnyuA0gBnPceQn448bayvnmxi_R9Lg?e=CHcUfy">240619 Preliminary EIA PV Park in Asgata.pdf</a></p><p class="sqsrte-large">Anyone can submit their comments and opinion(s) regarding the content of the Study or the potential environmental impacts that the Project may have at the following email address: <a href="mailto:info@alaplanning.com">info@alaplanning.com</a>.</p>]]></content:encoded><media:content type="image/jpeg" url="https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/1718957407475-G6X4KVVGPT9QU4PWS8L7/photo+sm.jpg?format=1500w" medium="image" isDefault="true" width="1500" height="998"><media:title type="plain">Public Consultation for the construction and operation of a 2,5 MW Photovoltaic Park in the Community of Asgata, Limassol District</media:title></media:content></item><item><title>Public Consultation for the construction and operation of a 3,769 MW Photovoltaic Park in Dali Municipality</title><dc:creator>Evi Argyridou</dc:creator><pubDate>Tue, 28 May 2024 12:41:00 +0000</pubDate><link>https://alaplanning.com/news/public-consultation-for-the-construction-and-operation-of-a-3769-mw-photovoltaic-park-in-dali-municipality</link><guid isPermaLink="false">6486d2b3bf60a10890a2b0dc:64935a59c20b206ba87b8dfb:6655d09cd2a5c95ff37a9e51</guid><description><![CDATA[The Preliminary Environmental Impact Assessment Study prepared for the 
above Project will be available until the 12th of June 2024 in the 
following link:]]></description><content:encoded><![CDATA[<figure class="
              sqs-block-image-figure
              intrinsic
            "
        >
          
        
        

        
          
            
          
            
                
                
                
                
                
                
                
                <img data-stretch="false" data-image="https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/a6de3303-3071-4ec7-8c2d-3e10b9949e98/PV+Park+sm.jpg" data-image-dimensions="998x748" data-image-focal-point="0.5,0.5" alt="" data-load="false" elementtiming="system-image-block" src="https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/a6de3303-3071-4ec7-8c2d-3e10b9949e98/PV+Park+sm.jpg?format=1000w" width="998" height="748" sizes="(max-width: 640px) 100vw, (max-width: 767px) 100vw, 100vw" onload="this.classList.add(&quot;loaded&quot;)" srcset="https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/a6de3303-3071-4ec7-8c2d-3e10b9949e98/PV+Park+sm.jpg?format=100w 100w, https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/a6de3303-3071-4ec7-8c2d-3e10b9949e98/PV+Park+sm.jpg?format=300w 300w, https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/a6de3303-3071-4ec7-8c2d-3e10b9949e98/PV+Park+sm.jpg?format=500w 500w, https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/a6de3303-3071-4ec7-8c2d-3e10b9949e98/PV+Park+sm.jpg?format=750w 750w, https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/a6de3303-3071-4ec7-8c2d-3e10b9949e98/PV+Park+sm.jpg?format=1000w 1000w, https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/a6de3303-3071-4ec7-8c2d-3e10b9949e98/PV+Park+sm.jpg?format=1500w 1500w, https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/a6de3303-3071-4ec7-8c2d-3e10b9949e98/PV+Park+sm.jpg?format=2500w 2500w" loading="lazy" decoding="async" data-loader="sqs">

            
          
        
          
        

        
      
        </figure>
      

    
  


  





  <p class="sqsrte-large">The Preliminary Environmental Impact Assessment Study prepared for the above Project will be available until the 12th of June 2024 in the following link:</p><p class="sqsrte-large"><a href="https://alaplanning0-my.sharepoint.com/:b:/g/personal/eargyridou_alaplanning_com/EUheVUPqvg5NpGvWGEDm6LIBf_ln04LnwBxZto6dqDkEvw?e=wohEz0">MEEP PV Park, Dali DF.pdf</a></p><p class="sqsrte-large">Anyone can submit their comments and opinion(s) regarding the content of the Study or the potential environmental impacts that the Project may have at the following email address: info@alaplanning.com.</p>]]></content:encoded><media:content type="image/jpeg" url="https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/1716900252302-GX5ONLZ5ICYLIFFAF1W2/PV+Park+sm.jpg?format=1500w" medium="image" isDefault="true" width="998" height="748"><media:title type="plain">Public Consultation for the construction and operation of a 3,769 MW Photovoltaic Park in Dali Municipality</media:title></media:content></item><item><title>Public Consultation for the construction and operation of a 2,646 MW Photovoltaic Park in the Community of Agios Theodoros in Larnaca</title><dc:creator>Evi Argyridou</dc:creator><pubDate>Tue, 28 May 2024 05:09:00 +0000</pubDate><link>https://alaplanning.com/news/public-consultation-for-the-construction-and-operation-of-a-2646-mw-photovoltaic-park-in-the-community-of-agios-theodoros-in-larnaca</link><guid isPermaLink="false">6486d2b3bf60a10890a2b0dc:64935a59c20b206ba87b8dfb:6655c8c5647b1305dfd29d2f</guid><description><![CDATA[The Preliminary Environmental Impact Assessment Study prepared for the 
above Project will be available until the 12th of June 2024 in the 
following link:]]></description><content:encoded><![CDATA[<figure class="
              sqs-block-image-figure
              intrinsic
            "
        >
          
        
        

        
          
            
          
            
                
                
                
                
                
                
                
                <img data-stretch="false" data-image="https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/e7500f84-ff65-4795-8668-0c8891c9bc5e/ALA_Services_4+sm.jpg" data-image-dimensions="2186x1456" data-image-focal-point="0.5,0.5" alt="" data-load="false" elementtiming="system-image-block" src="https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/e7500f84-ff65-4795-8668-0c8891c9bc5e/ALA_Services_4+sm.jpg?format=1000w" width="2186" height="1456" sizes="(max-width: 640px) 100vw, (max-width: 767px) 100vw, 100vw" onload="this.classList.add(&quot;loaded&quot;)" srcset="https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/e7500f84-ff65-4795-8668-0c8891c9bc5e/ALA_Services_4+sm.jpg?format=100w 100w, https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/e7500f84-ff65-4795-8668-0c8891c9bc5e/ALA_Services_4+sm.jpg?format=300w 300w, https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/e7500f84-ff65-4795-8668-0c8891c9bc5e/ALA_Services_4+sm.jpg?format=500w 500w, https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/e7500f84-ff65-4795-8668-0c8891c9bc5e/ALA_Services_4+sm.jpg?format=750w 750w, https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/e7500f84-ff65-4795-8668-0c8891c9bc5e/ALA_Services_4+sm.jpg?format=1000w 1000w, https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/e7500f84-ff65-4795-8668-0c8891c9bc5e/ALA_Services_4+sm.jpg?format=1500w 1500w, https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/e7500f84-ff65-4795-8668-0c8891c9bc5e/ALA_Services_4+sm.jpg?format=2500w 2500w" loading="lazy" decoding="async" data-loader="sqs">

            
          
        
          
        

        
      
        </figure>
      

    
  


  





  <p class="sqsrte-large">The Preliminary Environmental Impact Assessment Study prepared for the above Project will be available until the 12th &nbsp;of June 2024 in the following link:</p><p class="sqsrte-large"><a href="https://alaplanning0-my.sharepoint.com/:b:/g/personal/eargyridou_alaplanning_com/EQfItUVMfXpGoroIo41O1-QB6AspspmlEbIDOMSTi1E3Ww?e=ANwbK6">MEEP PV Park Ag. Theod DF.pdf</a></p><p class="sqsrte-large">Anyone can submit their comments and opinion(s) regarding the content of the Study or the potential environmental impacts that the Project may have at the following email address: info@alaplanning.com.</p>]]></content:encoded><media:content type="image/jpeg" url="https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/1716899003395-MNX00R9JBCVI0O69LZQ7/ALA_Services_4+sm.jpg?format=1500w" medium="image" isDefault="true" width="1500" height="999"><media:title type="plain">Public Consultation for the construction and operation of a 2,646 MW Photovoltaic Park in the Community of Agios Theodoros in Larnaca</media:title></media:content></item><item><title>Public Consultation for the Project Blue Submarine Cable System (Blue SCS), A submarine fibre-optic communications cable linking France to Israel with connections to Italy, Greece and Cyprus</title><dc:creator>Evi Argyridou</dc:creator><pubDate>Mon, 29 Jan 2024 06:00:00 +0000</pubDate><link>https://alaplanning.com/news/public-consultation-for-the-project-blue-submarine-cable-system-blue-scs-a-submarine-fibre-optic-communications-cable-linking-france-to-israel-with-connections-to-italy-greece-and-cyprus</link><guid isPermaLink="false">6486d2b3bf60a10890a2b0dc:64935a59c20b206ba87b8dfb:65b786f50ae7317247ebb6f9</guid><description><![CDATA[The Preliminary Environmental Impact Assessment Study prepared for the 
above Project will be available until the 7th of February 2024 in the 
following link:]]></description><content:encoded><![CDATA[<figure class="
              sqs-block-image-figure
              intrinsic
            "
        >
          
        
        

        
          
            
          
            
                
                
                
                
                
                
                
                <img data-stretch="false" data-image="https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/e2017964-63dd-4160-b8ae-a4fe9086f8b0/Picture2.jpg" data-image-dimensions="817x456" data-image-focal-point="0.5,0.5" alt="" data-load="false" elementtiming="system-image-block" src="https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/e2017964-63dd-4160-b8ae-a4fe9086f8b0/Picture2.jpg?format=1000w" width="817" height="456" sizes="(max-width: 640px) 100vw, (max-width: 767px) 100vw, 100vw" onload="this.classList.add(&quot;loaded&quot;)" srcset="https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/e2017964-63dd-4160-b8ae-a4fe9086f8b0/Picture2.jpg?format=100w 100w, https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/e2017964-63dd-4160-b8ae-a4fe9086f8b0/Picture2.jpg?format=300w 300w, https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/e2017964-63dd-4160-b8ae-a4fe9086f8b0/Picture2.jpg?format=500w 500w, https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/e2017964-63dd-4160-b8ae-a4fe9086f8b0/Picture2.jpg?format=750w 750w, https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/e2017964-63dd-4160-b8ae-a4fe9086f8b0/Picture2.jpg?format=1000w 1000w, https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/e2017964-63dd-4160-b8ae-a4fe9086f8b0/Picture2.jpg?format=1500w 1500w, https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/e2017964-63dd-4160-b8ae-a4fe9086f8b0/Picture2.jpg?format=2500w 2500w" loading="lazy" decoding="async" data-loader="sqs">

            
          
        
          
        

        
      
        </figure>
      

    
  


  





  <p class="sqsrte-large">The Preliminary Environmental Impact Assessment Study prepared for the above Project will be available until the 7th of February 2024 in the following link:</p><p class="sqsrte-large"><a href="https://cloud.alaplanning.com/owncloud/index.php/s/4FeLgXK1tpNrJut">https://cloud.alaplanning.com/owncloud/index.php/s/4FeLgXK1tpNrJut</a></p><p class="sqsrte-large">Anyone can submit their comments and opinion(s) regarding the content of the Study or the potential environmental impacts that the Project may have at the following email address: <a href="mailto:info@alaplanning.com">info@alaplanning.com</a>, until the 7th February 2024.</p>]]></content:encoded><media:content type="image/jpeg" url="https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/1706526923276-6E8QN4LT74JSYD2OHUZD/Picture2.jpg?format=1500w" medium="image" isDefault="true" width="817" height="456"><media:title type="plain">Public Consultation for the Project Blue Submarine Cable System (Blue SCS), A submarine fibre-optic communications cable linking France to Israel with connections to Italy, Greece and Cyprus</media:title></media:content></item><item><title>Public Presentation for the construction and operation of an integrated Development of Large and Complex Uses in Palodia Community, in Limassol Municipality</title><dc:creator>Evi Argyridou</dc:creator><pubDate>Mon, 11 Dec 2023 15:49:00 +0000</pubDate><link>https://alaplanning.com/news/public-presentation-for-the-construction-and-operation-of-an-integrated-development-of-large-and-complex-uses-in-palodia-community-in-limassol-municipality</link><guid isPermaLink="false">6486d2b3bf60a10890a2b0dc:64935a59c20b206ba87b8dfb:657dc6d7effcb828c6db17f8</guid><description><![CDATA[We invite you to the Public Presentation for the construction and operation 
of an Integrated Development of Large and Complex Uses in the Community of 
Palodia, in the Municipality of Limassol, which will take place on Monday, 
December 18, 2023, at 18:00 at the Panos Solomonidis Municipal Cultural 
Center (8 Panos Solomonidis Street, 3032 Limassol).]]></description><content:encoded><![CDATA[<figure class="
              sqs-block-image-figure
              intrinsic
            "
        >
          
        
        

        
          
            
          
            
                
                
                
                
                
                
                
                <img data-stretch="false" data-image="https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/820ee0db-89f8-4d02-aab8-26fd5cafa0c1/EIA+MasterPlan+Palodia+Photo.jpeg" data-image-dimensions="834x392" data-image-focal-point="0.5,0.5" alt="" data-load="false" elementtiming="system-image-block" src="https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/820ee0db-89f8-4d02-aab8-26fd5cafa0c1/EIA+MasterPlan+Palodia+Photo.jpeg?format=1000w" width="834" height="392" sizes="(max-width: 640px) 100vw, (max-width: 767px) 100vw, 100vw" onload="this.classList.add(&quot;loaded&quot;)" srcset="https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/820ee0db-89f8-4d02-aab8-26fd5cafa0c1/EIA+MasterPlan+Palodia+Photo.jpeg?format=100w 100w, https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/820ee0db-89f8-4d02-aab8-26fd5cafa0c1/EIA+MasterPlan+Palodia+Photo.jpeg?format=300w 300w, https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/820ee0db-89f8-4d02-aab8-26fd5cafa0c1/EIA+MasterPlan+Palodia+Photo.jpeg?format=500w 500w, https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/820ee0db-89f8-4d02-aab8-26fd5cafa0c1/EIA+MasterPlan+Palodia+Photo.jpeg?format=750w 750w, https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/820ee0db-89f8-4d02-aab8-26fd5cafa0c1/EIA+MasterPlan+Palodia+Photo.jpeg?format=1000w 1000w, https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/820ee0db-89f8-4d02-aab8-26fd5cafa0c1/EIA+MasterPlan+Palodia+Photo.jpeg?format=1500w 1500w, https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/820ee0db-89f8-4d02-aab8-26fd5cafa0c1/EIA+MasterPlan+Palodia+Photo.jpeg?format=2500w 2500w" loading="lazy" decoding="async" data-loader="sqs">

            
          
        
          
        

        
      
        </figure>
      

    
  


  





  <p class="sqsrte-large">We invite you to the Public Presentation for the construction and operation of an Integrated Development of Large and Complex Uses in the Community of Palodia, in the Municipality of Limassol, which will take place on Monday, December 18, 2023, at 18:00 at the Panos Solomonidis Municipal Cultural Center (8 Panos Solomonidis Street, 3032 Limassol).</p><p class="sqsrte-large">The Preliminary Environmental Impact Assessment Study prepared for the above Project will be available until then in the following link:</p><p class="sqsrte-large"><a href="https://cloud.alaplanning.com/owncloud/index.php/s/b4bm0PYRSidS4hf">https://cloud.alaplanning.com/owncloud/index.php/s/b4bm0PYRSidS4hf</a></p><p class="sqsrte-large">Anyone can submit their comments and opinion(s) regarding the content of the Study or the potential environmental impacts that the Project may have at the following email address: <a href="mailto:info@alaplanning.com">info@alaplanning.com</a>.</p>]]></content:encoded><media:content type="image/jpeg" url="https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/1702741805737-29J4HQ5LCLD6YDOMUAS8/EIA+MasterPlan+Palodia+Photo.jpeg?format=1500w" medium="image" isDefault="true" width="834" height="392"><media:title type="plain">Public Presentation for the construction and operation of an integrated Development of Large and Complex Uses in Palodia Community, in Limassol Municipality</media:title></media:content></item><item><title>Public Consultation for the construction and operation of an integrated Development of Large and Complex Uses in the Municipality of Agios Athanasios</title><dc:creator>Evi Argyridou</dc:creator><pubDate>Thu, 07 Dec 2023 15:45:00 +0000</pubDate><link>https://alaplanning.com/news/public-consultation-for-the-construction-and-operation-of-an-integrated-development-of-large-and-complex-uses-in-the-municipality-of-agios-athanasios</link><guid isPermaLink="false">6486d2b3bf60a10890a2b0dc:64935a59c20b206ba87b8dfb:657dc600130ab50c2c0cdda6</guid><description><![CDATA[The Preliminary Environmental Impact Assessment Study prepared for the 
above Project will be available until the 21st of December 2023 in the 
following link:]]></description><content:encoded><![CDATA[<figure class="
              sqs-block-image-figure
              intrinsic
            "
        >
          
        
        

        
          
            
          
            
                
                
                
                
                
                
                
                <img data-stretch="false" data-image="https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/c55080d6-d76a-45f4-aae4-bcce922963f0/EIA+Agios+Athanasios+Photo.jpeg" data-image-dimensions="900x506" data-image-focal-point="0.5,0.5" alt="" data-load="false" elementtiming="system-image-block" src="https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/c55080d6-d76a-45f4-aae4-bcce922963f0/EIA+Agios+Athanasios+Photo.jpeg?format=1000w" width="900" height="506" sizes="(max-width: 640px) 100vw, (max-width: 767px) 100vw, 100vw" onload="this.classList.add(&quot;loaded&quot;)" srcset="https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/c55080d6-d76a-45f4-aae4-bcce922963f0/EIA+Agios+Athanasios+Photo.jpeg?format=100w 100w, https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/c55080d6-d76a-45f4-aae4-bcce922963f0/EIA+Agios+Athanasios+Photo.jpeg?format=300w 300w, https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/c55080d6-d76a-45f4-aae4-bcce922963f0/EIA+Agios+Athanasios+Photo.jpeg?format=500w 500w, https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/c55080d6-d76a-45f4-aae4-bcce922963f0/EIA+Agios+Athanasios+Photo.jpeg?format=750w 750w, https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/c55080d6-d76a-45f4-aae4-bcce922963f0/EIA+Agios+Athanasios+Photo.jpeg?format=1000w 1000w, https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/c55080d6-d76a-45f4-aae4-bcce922963f0/EIA+Agios+Athanasios+Photo.jpeg?format=1500w 1500w, https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/c55080d6-d76a-45f4-aae4-bcce922963f0/EIA+Agios+Athanasios+Photo.jpeg?format=2500w 2500w" loading="lazy" decoding="async" data-loader="sqs">

            
          
        
          
        

        
      
        </figure>
      

    
  


  





  <p class="sqsrte-large">The Preliminary Environmental Impact Assessment Study prepared for the above Project will be available until the 21st of December 2023 in the following link:</p><p class="sqsrte-large"><a href="https://cloud.alaplanning.com/owncloud/index.php/s/bCtVYdqEZpAaKVr">https://cloud.alaplanning.com/owncloud/index.php/s/bCtVYdqEZpAaKVr</a></p><p class="sqsrte-large">Anyone can submit their comments and opinion(s) regarding the content of the Study or the potential environmental impacts that the Project may have at the following email address: <a href="mailto:info@alaplanning.com">info@alaplanning.com</a>.</p>]]></content:encoded><media:content type="image/jpeg" url="https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/1702741646031-MUGRGXZV9DW4CW7JWB6C/EIA+Agios+Athanasios+Photo.jpeg?format=1500w" medium="image" isDefault="true" width="900" height="506"><media:title type="plain">Public Consultation for the construction and operation of an integrated Development of Large and Complex Uses in the Municipality of Agios Athanasios</media:title></media:content></item><item><title>Launch of the Sustainable Toolkit for the Assessment of Master Plans (STAMP)</title><dc:creator>Evi Argyridou</dc:creator><pubDate>Thu, 01 Jun 2023 23:00:00 +0000</pubDate><link>https://alaplanning.com/news/launch-of-the-sustainable-toolkit-for-the-assessment-of-master-plans-stamp</link><guid isPermaLink="false">6486d2b3bf60a10890a2b0dc:64935a59c20b206ba87b8dfb:649442dbbb4b9a3e505d620d</guid><description><![CDATA[ALA Planning Partnership is delighted to announce the launch of STAMP! The 
Sustainable Toolkit for the Assessment of Master Plans. Created through a 
collaboration between ALA Planning Partnership Consultancy L.L.C., the 
Society and Urban Form (SURF) Research Lab and the Software Engineering and 
Internet Technologies Lab at the University of Cyprus, which started in the 
framework of KAEBUP.]]></description><content:encoded><![CDATA[<figure class="
              sqs-block-image-figure
              intrinsic
            "
        >
          
        
        

        
          
            
          
            
                
                
                
                
                
                
                
                <img data-stretch="false" data-image="https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/1701979439736-1STHCE0G4KSH9CTUSURZ/STAMP_1.jpg" data-image-dimensions="8000x6000" data-image-focal-point="0.5,0.5" alt="" data-load="false" elementtiming="system-image-block" src="https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/1701979439736-1STHCE0G4KSH9CTUSURZ/STAMP_1.jpg?format=1000w" width="8000" height="6000" sizes="(max-width: 640px) 100vw, (max-width: 767px) 100vw, 100vw" onload="this.classList.add(&quot;loaded&quot;)" srcset="https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/1701979439736-1STHCE0G4KSH9CTUSURZ/STAMP_1.jpg?format=100w 100w, https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/1701979439736-1STHCE0G4KSH9CTUSURZ/STAMP_1.jpg?format=300w 300w, https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/1701979439736-1STHCE0G4KSH9CTUSURZ/STAMP_1.jpg?format=500w 500w, https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/1701979439736-1STHCE0G4KSH9CTUSURZ/STAMP_1.jpg?format=750w 750w, https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/1701979439736-1STHCE0G4KSH9CTUSURZ/STAMP_1.jpg?format=1000w 1000w, https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/1701979439736-1STHCE0G4KSH9CTUSURZ/STAMP_1.jpg?format=1500w 1500w, https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/1701979439736-1STHCE0G4KSH9CTUSURZ/STAMP_1.jpg?format=2500w 2500w" loading="lazy" decoding="async" data-loader="sqs">

            
          
        
          
        

        
      
        </figure>
      

    
  


  





  <p class="sqsrte-large">ALA Planning Partnership is delighted to announce the launch of STAMP! The Sustainable Toolkit for the Assessment of Master Plans. Created through a collaboration between ALA Planning Partnership Consultancy L.L.C., the Society and Urban Form (SURF) Research Lab and the Software Engineering and Internet Technologies Lab at the University of Cyprus, which started in the framework of KAEBUP. </p><p class="sqsrte-large"><a href="https://www.kaebup.eu/index.php/stamp/">https://www.kaebup.eu/index.php/stamp/</a></p><p class="sqsrte-large">STAMP is an online toolkit which aims to assist practitioners and students in the built environment field in assessing the degree of sustainability of proposed masterplans and to incorporate sustainability into their design.</p><p class="sqsrte-large">The tool is designed to assist:</p><ul data-rte-list="default"><li><p class="sqsrte-large">Built environment professionals to self-assess their masterplan design throughout the design process from initial design to final design and construction.</p></li><li><p class="sqsrte-large">Academics as a teaching and learning tool to assist the teaching of architecture, planning and masterplanning students and inform them about sustainability principles.</p></li><li><p class="sqsrte-large">Professionals in the public and private sectors (planning/permitting authorities, consultants, etc.) closely involved in the masterplan design process to support them assess the sustainability of a proposed master plan.</p></li></ul><p class="sqsrte-large">The toolkit allows for the creation and storage of various masterplan projects, which can be evaluated at different phases of the design process. It provides a visual summary (chart) of each evaluation, as well as comparative charts of multiple evaluations of different stages/versions of the same master plan. The master plans are evaluated across 14 categories which include vision, governance, health, mobility, air, climate, nature, water, soil, landscape, waste, land use, construction and community.</p><p class="sqsrte-large">The toolkit is designed to be a time-efficient and easy to use instrument to foster consideration of different sustainability aspects within master plans. It can be completed within 30 minutes, providing immediate feedback for decision-making and clarity on the actions needed to improve the sustainability of a project.</p>]]></content:encoded><media:content type="image/jpeg" url="https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/1701882859512-EA0XBAZ07BLKGZB1P8WH/STAMP_1.jpg?format=1500w" medium="image" isDefault="true" width="1500" height="1125"><media:title type="plain">Launch of the Sustainable Toolkit for the Assessment of Master Plans (STAMP)</media:title></media:content></item><item><title>Public Consultation for the construction and operation of the proposed office development “Global Tower” in Germasogia</title><dc:creator>Evi Argyridou</dc:creator><pubDate>Thu, 11 May 2023 13:16:00 +0000</pubDate><link>https://alaplanning.com/news/public-consultation-for-the-construction-and-operation-of-the-proposed-office-development-global-tower-in-germasogia</link><guid isPermaLink="false">6486d2b3bf60a10890a2b0dc:64935a59c20b206ba87b8dfb:64944980db47077f097b6bbb</guid><description><![CDATA[The Preliminary Environmental Impact Assessment Study prepared for the 
above Project will be available until the 25th of May 2023 in the following 
link:]]></description><content:encoded><![CDATA[<figure class="
              sqs-block-image-figure
              intrinsic
            "
        >
          
        
        

        
          
            
          
            
                
                
                
                
                
                
                
                <img data-stretch="true" data-image="https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/6625f7d7-bb7d-4c9f-aeb2-91f44df08b7f/photo+for+article.jpg" data-image-dimensions="1024x576" data-image-focal-point="0.5,0.5" alt="" data-load="false" elementtiming="system-image-block" src="https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/6625f7d7-bb7d-4c9f-aeb2-91f44df08b7f/photo+for+article.jpg?format=1000w" width="1024" height="576" sizes="(max-width: 640px) 100vw, (max-width: 767px) 100vw, 100vw" onload="this.classList.add(&quot;loaded&quot;)" srcset="https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/6625f7d7-bb7d-4c9f-aeb2-91f44df08b7f/photo+for+article.jpg?format=100w 100w, https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/6625f7d7-bb7d-4c9f-aeb2-91f44df08b7f/photo+for+article.jpg?format=300w 300w, https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/6625f7d7-bb7d-4c9f-aeb2-91f44df08b7f/photo+for+article.jpg?format=500w 500w, https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/6625f7d7-bb7d-4c9f-aeb2-91f44df08b7f/photo+for+article.jpg?format=750w 750w, https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/6625f7d7-bb7d-4c9f-aeb2-91f44df08b7f/photo+for+article.jpg?format=1000w 1000w, https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/6625f7d7-bb7d-4c9f-aeb2-91f44df08b7f/photo+for+article.jpg?format=1500w 1500w, https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/6625f7d7-bb7d-4c9f-aeb2-91f44df08b7f/photo+for+article.jpg?format=2500w 2500w" loading="lazy" decoding="async" data-loader="sqs">

            
          
        
          
        

        
      
        </figure>
      

    
  


  





  <p class="sqsrte-large">The Preliminary Environmental Impact Assessment Study prepared for the above Project will be available until the 25th of May 2023 in the following link:</p><p class="sqsrte-large"><a href="https://cloud.alaplanning.com/owncloud/index.php/s/hnR0byIM8oIazrV">https://cloud.alaplanning.com/owncloud/index.php/s/hnR0byIM8oIazrV</a></p><p class="sqsrte-large">Anyone can submit their comments and opinion(s) regarding the content of the Study or the potential environmental impacts that the Project may have at the following email address: <a href="mailto:info@alaplanning.com">info@alaplanning.com</a>.</p>]]></content:encoded><media:content type="image/jpeg" url="https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/1698260309780-93QEVM5FB9FD11U2YI9L/photo+for+article.jpg?format=1500w" medium="image" isDefault="true" width="1024" height="576"><media:title type="plain">Public Consultation for the construction and operation of the proposed office development “Global Tower” in Germasogia</media:title></media:content></item><item><title>Public Consultation for the construction and operation of the touristic development “Ermou Hotel” in Larnaca Municipality</title><dc:creator>Evi Argyridou</dc:creator><pubDate>Tue, 21 Feb 2023 14:21:00 +0000</pubDate><link>https://alaplanning.com/news/public-consultation-for-the-construction-and-operation-of-the-touristic-development-ermou-hotel-in-larnaca-municipality</link><guid isPermaLink="false">6486d2b3bf60a10890a2b0dc:64935a59c20b206ba87b8dfb:64944a386e4b503e0a15975b</guid><description><![CDATA[The Preliminary Environmental Impact Assessment Study prepared for the 
above Project will be available until the 7th of March 2023 in the 
following link:]]></description><content:encoded><![CDATA[<figure class="
              sqs-block-image-figure
              intrinsic
            "
        >
          
        
        

        
          
            
          
            
                
                
                
                
                
                
                
                <img data-stretch="true" data-image="https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/1698260424717-7EUM9S8I4Q9ELGW1DNFT/Photo.jpg" data-image-dimensions="933x700" data-image-focal-point="0.5,0.5" alt="" data-load="false" elementtiming="system-image-block" src="https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/1698260424717-7EUM9S8I4Q9ELGW1DNFT/Photo.jpg?format=1000w" width="933" height="700" sizes="(max-width: 640px) 100vw, (max-width: 767px) 100vw, 100vw" onload="this.classList.add(&quot;loaded&quot;)" srcset="https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/1698260424717-7EUM9S8I4Q9ELGW1DNFT/Photo.jpg?format=100w 100w, https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/1698260424717-7EUM9S8I4Q9ELGW1DNFT/Photo.jpg?format=300w 300w, https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/1698260424717-7EUM9S8I4Q9ELGW1DNFT/Photo.jpg?format=500w 500w, https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/1698260424717-7EUM9S8I4Q9ELGW1DNFT/Photo.jpg?format=750w 750w, https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/1698260424717-7EUM9S8I4Q9ELGW1DNFT/Photo.jpg?format=1000w 1000w, https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/1698260424717-7EUM9S8I4Q9ELGW1DNFT/Photo.jpg?format=1500w 1500w, https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/1698260424717-7EUM9S8I4Q9ELGW1DNFT/Photo.jpg?format=2500w 2500w" loading="lazy" decoding="async" data-loader="sqs">

            
          
        
          
        

        
      
        </figure>
      

    
  


  





  <p class="sqsrte-large">The Preliminary Environmental Impact Assessment Study prepared for the above Project will be available until the 7th of March 2023 in the following link:</p><p class="sqsrte-large"><a href="https://cloud.alaplanning.com/owncloud/index.php/s/5UYZ0xiUVMg5F67">https://cloud.alaplanning.com/owncloud/index.php/s/5UYZ0xiUVMg5F67</a></p><p class="sqsrte-large">Anyone can submit their comments and opinion(s) regarding the content of the Study or the potential environmental impacts that the Project may have at the following email address: <a href="mailto:info@alaplanning.com">info@alaplanning.com</a>.</p>]]></content:encoded><media:content type="image/jpeg" url="https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/1698260424717-7EUM9S8I4Q9ELGW1DNFT/Photo.jpg?format=1500w" medium="image" isDefault="true" width="933" height="700"><media:title type="plain">Public Consultation for the construction and operation of the touristic development “Ermou Hotel” in Larnaca Municipality</media:title></media:content></item><item><title>Public Consultation for the construction and operation of two multi-storey residential buildings and the execution of additions/modifications to the existing Parklane Hotel, in Pyrgos, Limassol</title><dc:creator>Evi Argyridou</dc:creator><pubDate>Mon, 20 Feb 2023 14:24:00 +0000</pubDate><link>https://alaplanning.com/news/public-consultation-for-the-construction-and-operation-of-two-multi-storey-residential-buildings-and-the-execution-of-additionsmodifications-to-the-existing-parklane-hotel-in-pyrgos-limassol</link><guid isPermaLink="false">6486d2b3bf60a10890a2b0dc:64935a59c20b206ba87b8dfb:64944b308fa2f47731f28bee</guid><description><![CDATA[The Preliminary Environmental Impact Assessment Study prepared for the 
above Project will be available until the 6th of March 2023 in the 
following link:]]></description><content:encoded><![CDATA[<figure class="
              sqs-block-image-figure
              intrinsic
            "
        >
          
        
        

        
          
            
          
            
                
                
                
                
                
                
                
                <img data-stretch="true" data-image="https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/1e9df34b-0694-48e4-a4b2-0d862bbebdce/3+TOWERS+VIEW.jpg" data-image-dimensions="5472x3078" data-image-focal-point="0.5,0.5" alt="" data-load="false" elementtiming="system-image-block" src="https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/1e9df34b-0694-48e4-a4b2-0d862bbebdce/3+TOWERS+VIEW.jpg?format=1000w" width="5472" height="3078" sizes="(max-width: 640px) 100vw, (max-width: 767px) 100vw, 100vw" onload="this.classList.add(&quot;loaded&quot;)" srcset="https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/1e9df34b-0694-48e4-a4b2-0d862bbebdce/3+TOWERS+VIEW.jpg?format=100w 100w, https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/1e9df34b-0694-48e4-a4b2-0d862bbebdce/3+TOWERS+VIEW.jpg?format=300w 300w, https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/1e9df34b-0694-48e4-a4b2-0d862bbebdce/3+TOWERS+VIEW.jpg?format=500w 500w, https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/1e9df34b-0694-48e4-a4b2-0d862bbebdce/3+TOWERS+VIEW.jpg?format=750w 750w, https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/1e9df34b-0694-48e4-a4b2-0d862bbebdce/3+TOWERS+VIEW.jpg?format=1000w 1000w, https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/1e9df34b-0694-48e4-a4b2-0d862bbebdce/3+TOWERS+VIEW.jpg?format=1500w 1500w, https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/1e9df34b-0694-48e4-a4b2-0d862bbebdce/3+TOWERS+VIEW.jpg?format=2500w 2500w" loading="lazy" decoding="async" data-loader="sqs">

            
          
        
          
        

        
      
        </figure>
      

    
  


  





  <p class="sqsrte-large">The Preliminary Environmental Impact Assessment Study prepared for the above Project will be available until the 6th of March 2023 in the following link:</p><p class="sqsrte-large"><a href="https://cloud.alaplanning.com/owncloud/index.php/s/lEWegorpNm9Db35">https://cloud.alaplanning.com/owncloud/index.php/s/lEWegorpNm9Db35</a></p><p class="sqsrte-large">Anyone can submit their comments and opinion(s) regarding the content of the Study or the potential environmental impacts that the Project may have at the following email address: <a href="mailto:info@alaplanning.com">info@alaplanning.com</a>.</p>]]></content:encoded><media:content type="image/jpeg" url="https://images.squarespace-cdn.com/content/v1/6486d2b3bf60a10890a2b0dc/1698260524964-38GOXT58W6C3C7ZQTKW9/3+TOWERS+VIEW.jpg?format=1500w" medium="image" isDefault="true" width="1500" height="844"><media:title type="plain">Public Consultation for the construction and operation of two multi-storey residential buildings and the execution of additions/modifications to the existing Parklane Hotel, in Pyrgos, Limassol</media:title></media:content></item></channel></rss>